Paying a designer in stages, and what the contract should say

Before you sign, lay the payment schedule next to the list of drawings. Each instalment should buy a drawing you can hold or work you can see on site.

Two published schedules to measure a quote against

Nobody regulates how interior designers bill. The useful reference points come from the Council of Architecture (COA), which has published two stage-wise schedules for design fees: an older one in the conditions of engagement on its website, and a newer, more detailed one in its 2022 practice manual. Both show the share of the total fee paid by the end of each stage.

Stage COA web conditions, cumulative COA 2022 manual, cumulative
On signing Retainer of ₹20,000 or 5% of the fee, whichever is higher, adjusted at the last stage 10%
Concept design 10% 20%
Preliminary or schematic design 20% 30%
Drawings for approval 30% No separate stage
Statutory approval received 35% 35%
Detail design No separate stage 45%
Working drawings, specifications, quantities 45% 65%
Tenders and choosing contractors 55% 75%
Construction 65% when work starts, then 70, 75, 80 and 85% as work reaches 20, 40, 60 and 80%, and 90% at virtual completion 95%, in instalments with progress
Completion and as-built drawings 100% 100%

The two differ mainly in timing. The manual collects more of the fee during the drawing stages and less once building starts. When building starts, a quarter of the fee is still unpaid under the manual, and 35% under the web conditions once the start-of-work instalment is in.

For design-and-build firms the shape changes, because your money is also buying material and factory time. DesignCafe’s Gurugram page gives its own split as 10% at booking, 40% at design, 40% at production and 10% at installation.

Design fees and building payments are separate

If you hire a designer for drawings and a contractor for the work, there are two payment streams. The designer’s fee follows the drawings. The contractor’s payments follow work measured on site, which should be checked against the drawings and the bill of quantities before you pay. The COA’s web scale lists checking contractors’ bills as an extra service with its own charge, so agree in writing who does it.

In a turnkey contract the two streams merge into one, and the schedule should then follow site progress, with a defined amount for each milestone.

What you should hold after each payment

After paying for You should have
Concept A brief you have approved, layout options, a rough cost estimate
Design development A chosen layout, 3D views or samples, a revised estimate
Working drawings Dimensioned drawings, electrical and plumbing layouts, joinery details, specifications, a bill of quantities
Contractor selection Comparable quotes against the same drawings
Each construction instalment Work on site matching the drawings, visited and checked
Final instalment Snags closed, as-built drawings, warranties and manuals

If a schedule asks for most of the fee before working drawings exist, ask what you are paying for at that point.

What the contract should spell out

The COA’s regulations require an architect to agree the conditions of engagement with the client before work starts. Interior designers have no such rule. The COA’s terms for architects make a good checklist, and several points below borrow from them.

  • List the rooms covered, and say whether civil work, electrical rewiring, false ceilings, loose furniture, appliances and approvals are in or out.
  • List the drawings due at each stage and match them to the payments. The COA’s conditions include up to six sets of drawings at no extra cost.
  • Fix the number of site visits and the charge for extra ones. The COA conditions expect the architect to visit “at intervals mutually agreed upon”, with day-to-day supervision by a site supervisor whom the client appoints and pays. Check whether an interior quote covers this at all. If you expect someone on site daily, name that person and say who pays them.
  • Say how many rounds of changes come before each stage is signed off. After sign-off, the COA conditions charge 50% of that stage’s fee for revisions, and the 2022 manual says redesign can cost up to 50% of the original fee.
  • Require a written change order for any variation during construction, with its cost and time effect, approved before the work is done.
  • Set a schedule by phase, and say what happens when either side causes delay.
  • Tie payments to deliverables and site progress, with dates only as targets. Name the payment period as well. For comparison, the 2022 manual suggests invoices within 7 days of finishing a stage and payment within 15 days of accepting them, with interest on late payment, while the older web conditions give the client a month. Say whether GST is extra.
  • Hold back a retention until snags are closed. Studio Matrx’s checklist suggests 5 to 10%, released only after handover and a formal snag list.
  • Agree how either side can end the contract. The COA conditions allow 30 days’ written notice from either side, and charge a client who curtails the work after stage 2 at least 20% of the fee for the remaining stages.
  • Settle who owns the drawings. Under the COA conditions the design stays the architect’s intellectual property, and the client keeps copies for use on that project. If the agreement ends, the client may appoint another architect to finish the work after paying the first firm. Get this in writing before you need the files for a future renovation.

Red flags in a schedule or contract

  • A large advance before a written contract exists, which Studio Matrx lists as a deal-breaker. Its contract checklist suggests a booking amount of 5 to 10% and warns against paying 70 to 80% of the whole job before execution begins. The COA manual’s 75% by tender stage is different, because it is a share of the design fee alone.
  • A single lump-sum figure with no bill of quantities or itemised breakdown.
  • Instalments due on calendar dates regardless of what has been delivered.
  • No named person responsible for the site.
  • Vague answers on warranties or revisions, which Tint Tone and Shade also lists as a warning sign.
  • Cash-only payment, or no GST registration on a business that should have one.

Questions

How quickly should I pay a designer’s invoice?

Within whatever period the contract names, so make sure it names one. Measured against the COA’s 15 days and one month, a demand for payment within two or three days is worth questioning.

Sources

  1. Council of Architecture, Conditions of Engagement for Comprehensive Architectural Services
  2. Council of Architecture, Manual of Architectural Practice Vol. 4 (2022)
  3. DesignCafe, Interior design cost in Gurgaon (14 Mar 2026)
  4. Studio Matrx, Contract clause checklist
  5. Studio Matrx, Interior contractor warning signs (28 May 2026)
  6. Tint Tone and Shade, Questions to ask before hiring an interior designer

The most interesting project on this website isn't here yet. Maybe it's yours.