Checked 24 Oct 2026
What to check before you sign with an interior designer
Start with a finished room you can stand in, ideally a kitchen with a year or two of use behind it. A 3D view shows what the designer meant to build, and a photograph shows the room on the day it was finished.
Ask which pictures are real
Go through the portfolio with the designer and ask, image by image, which are completed projects and which are 3D views, stock photographs or mood boards. For each finished project you like, ask where it is, roughly what it cost, and whether the designer ran the site or only drew it. If nothing in the portfolio has been built, you would be their test project.
Visit a finished site
Ask to see a home or office that has been lived in for a year or two. Wear and weather show up in that time. A designer with built work should be able to arrange a visit. If yours can’t, ask why. On a finished site, these are the things we would look at:
- shutters and drawer fronts, for even gaps and whether they still close square
- the edges of laminate and veneer, especially near the kitchen sink and in bathrooms
- wardrobes on outside walls, for damp or swelling at the base
- switchboards and light points, and whether the furniture lets you reach them
- paint and grout around fixtures, where rushed work shows first
Then ask the owner what they would change, and what the designer did when something went wrong.
Speak to past clients
A phone call with a past client covers what a site visit cannot: how delays were handled, how changes were priced, and whether the designer stayed involved once most of the money was paid. Ask about delays and disagreements specifically, because those answers tell you more than praise does.
Get the scope in writing
Get written scopes from two or three designers, and before you compare prices, make sure they describe the same job. A written scope should list the rooms covered, the drawings you will receive, the number of site visits and rounds of changes, and what is excluded. Check each quote for civil work, electrical rewiring, false ceilings, loose furniture and appliances, since these are easy to leave out of a headline number.
Ask for a bill of quantities, with material grades and brands, instead of a single figure. If the fee is per sq ft, find out which area. Flats in NCR are commonly advertised on super area, while carpet area under section 2(k) of RERA is the usable floor inside the external walls.
Find out who builds it
Who builds the design decides who you chase when a shutter swells. The turnkey and design-only comparison goes further into the first two.
| Arrangement | Who you pay for the work | Who answers for defects |
|---|---|---|
| Design only | Contractors and vendors you hire, against the designer’s drawings | Each contractor, under their own contract |
| Turnkey with the designer | The designer’s firm, for design and execution | The designer’s firm, under one contract |
| Design-and-build platform | The platform, for design and modular work | The platform, under its terms |
With design only, someone has to watch the site daily. Even the Council of Architecture’s conditions of engagement for architects assume only periodic visits, with day-to-day supervision by a site supervisor the client appoints and pays. Interior designers have no such published terms, so ask who will be on site, by name, and put it in the contract.
With platforms, check what the price covers. Livspace, for one, says on its Delhi page that its starting prices cover modular interiors for new homes only.
If the work touches the structure, check the signature
Most interior work stays inside an existing structure. Adding a floor, extending a house or rebuilding a kothi is building work under the local building rules, and then the person who signs the drawings matters.
In Haryana, the Haryana Building Code, 2017 requires the owner to appoint an architect or engineer to prepare the plans and supervise, and lets residences up to 500 sq m be approved on an architect’s self-certification. Self-certification is enforced. In Oct 2024 the state’s planning department blacklisted 18 architects and set a ₹2 lakh penalty per violation over occupation certificates issued for unauthorised stilt-plus-four buildings, as The Tribune reported. In Delhi, the MCD’s portal assigns sanction for plots up to 500 sq m to a registered architect, engineer or licensed supervisor, depending on plot size.
Anyone who calls themselves an architect should be on the Council of Architecture register. There is no equivalent check for interior designers, because the title is unregulated.
Ask about money early
Ask how the fee is calculated, whether GST at 18% is included, how payments line up with stages, and what happens if you stop halfway. A booking amount for the first stage is reasonable, and 5 to 10% is the range Studio Matrx’s contract checklist suggests. The payment schedule guide covers the rest of the instalments.
Ask too whether the designer receives commissions from vendors. Regulation 2(1)(vi) of the 1989 conduct regulations bars registered architects from giving or taking discounts, commissions, gifts or other inducements for the introduction of clients or of work. It says nothing about suppliers, and interior designers have no rule on commissions at all, so put the question in writing and keep the answer.
When to walk away
Walk away if you see any of these. Studio Matrx’s list for contractors says much the same.
- no past client willing to take your call
- no GST registration or verifiable business identity
- no written quote, or cash only
- no fixed business address
- a large advance demanded before a contract is signed
Slow down and ask more questions if the quote is a single page with no bill of quantities, if the designer won’t name brands and grades, if nobody is named for the site, or if the timeline sounds faster than the work allows.
Questions
How many designers should I meet before choosing?
Two or three serious ones, enough to compare written scopes. A single quote gives you nothing to measure it against.
Should the designer I hire also be my contractor?
It depends on how much site supervision you can give. One contract for design and building puts defects on one firm. Separate contracts give you more control over prices and more work to coordinate.
Is it a bad sign if a designer asks for a fee before showing any design?
Not by itself. A booking amount for the first stage is normal. A large share of the total before a signed contract is the warning sign.
Do I need an architect for a flat renovation in Gurugram or Delhi?
For finishes, joinery and furniture inside a flat, no. Once the work adds floor area or needs a building plan approval, the drawings must be prepared and signed by a registered architect or engineer, or for small Delhi plots, a licensed supervisor.
Sources
- Studio Matrx, Interior contractor warning signs (28 May 2026)
- Studio Matrx, Contract clause checklist
- Council of Architecture, Conditions of Engagement for Comprehensive Architectural Services
- Council of Architecture, Architects (Professional Conduct) Regulations, 1989
- Haryana Building Code, 2017
- MCD, Ease of Doing Business, Citizen Corner
- The Tribune, 18 blacklisted architects face ₹2 lakh penalty (21 Oct 2024)
- Livspace, Interiors in Delhi
- Taxguru, Definition of carpet area under RERA 2016